logo
Documentation Site - Khaleej vACC
Kuwait Approach [OKKK_APP]
Initializing search
    VATSIM-khaleej-vacc/documentation-site
    • Home
    • Published Documents
    • Controller Guide
    • Pilot Briefings
    • Standard Operating Procedures
    • Training vMATS
    VATSIM-khaleej-vacc/documentation-site
    • Home
        • Letter of Agreement - Arabian vACC
        • Khaleej ATC Training Policy
        • Khaleej Code of Conduct Policy
        • Khaleej Global Data Protection Regulation
      • Euroscope Setup
      • Standard Routes
        • Arriving into Bahrain Intl.
        • Departing Bahrain Intl.
        • General Information
        • Arriving into Kuwait Intl.
        • Departing into Kuwait Intl.
        • General Information
      • Introduction
        • General Information
        • Bahrain Delivery [OBBI_DEL]
        • Bahrain Ground [OBBI_GND]
        • Bahrain Tower [OBBI_TWR]
        • Bahrain Approach [OBBI_APP]
        • Bahrain Radar [OBBB_CTR]
        • General Information
        • Kuwait Delivery [OKKK_DEL]
        • Kuwait Ground [OKKK_GND]
        • Kuwait Tower [OKKK_TWR]
        • Kuwait Approach [OKKK_APP]
          • 1.1. Introduction to VATSIM
          • 1.2. ATC Positions and Hierarchy
          • 1.3. ATC Ratings
          • 1.4. ATC Controller Practical Test (CPT) and Solo Validation (SV)
          • 2.1. Bahrain International Airport (OBBI)
          • 2.2. Kuwait International Airport (OKKK)
          • 3.1. Delivery (DEL)
          • 3.2. Ground (GND)
          • 4.1. Instrument Flight Rules (IFR)
          • 4.2. Visual Flight Rules (VFR)
          • 4.3. VFR Departures
          • 4.4. VFR Circuits
          • 5.1. Flight Routes
          • 6.1. Types of Charts
          • 6.2. Standard Instrument Departure (SID)
          • 6.3. Aerodrome Charts
          • 6.4. Initial Climbs
          • 7.1. Cruising Flight Level
          • 8.1. Introduction to ATIS
          • 8.2. METAR
          • 8.3. Notices to Airmen (NOTAM)
          • 8.4. Active Runway(s)
    1. Home
    2. Standard Operating Procedures
    3. Kuwait International Airport

    Kuwait Approach [OKKK_APP]

    To be completed

    Previous
    Kuwait Tower [OKKK_TWR]
    Next
    1.1. Introduction to VATSIM
    Made with Material for MkDocs